Customized Metso GP series Cost Friendly

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2017-07-07 10:19
Browse the number: 172
inquiry
Company Profile
 
 
Product details
Origin: Henan, China (Mainland)
Brand: Dashan
Model: HS-L-01
Type: Bushings
Machine Type: Crusher
Certification: ISO9001
Material: Bronze
Processing Type: Casting
Use: Ore Mining
Characteristic: Durable and stable
Weight: Based on the model
Processing type: Centrifugal casting
Price: FOB
QC control: 100% inspected by us, accepts third party inspection
Lubricant: Oiling
Drawing: Yes


Our company adopts advanced production process such as centrifugal casting for copper bushing and bearing bush. As compared to sand mold casting, centrifugal casting can obviously improve the tightness, wear resistance, tensile strength, tensile rate, flexing and extension. All of these improvements are not the same phenomenon as sand mold casting. This is because there is possibility of occurrence of sand holes when sand mold casting is used. Thus, making it the first choice for many complete set of machinery products.


The role of cone crusher spare parts are as slide bearings It has an irreplaceable role in the cone crusher. So, what is the specific role of the copper sleeve that makes something that requires attention?
 
Role cone crusher spare parts
Cone Crusher middle of a large gear assembly is cone crusher spare part, moving cone axis interpolation, the smaller gap of about 3 mm, under a larger gap of about 8 mm, can be measured with a thick fuse assembly, socket liner abrasion and wear of moving cone sphere will affect the gap, moving cone trajectory by decision.
 
How to replace the cone crusher spare parts :bronze bushing
1. Eccentric bushing
After locking filler hole drilling broken, then the eccentric bushing upside down, you can remove the bushing. Before installing the new one, you must check whether or not the eccentric sleeve hole size has cracked. When installing copper eccentric bushing, it is available in dry ice cooling. When pouring locking filler, eccentric and copper bushing must be at a temperature of about 70 degrees, eccentric and copper sleeve hole must be positive.
 
2. Upper head bushing and lower head bushing
Lower head bushing can be cut out, but make sure not to damage the moving cone bore. Upper head bushing can pull, and can be cooled with dry ice to speed up the pull-out speed. Dry ice can be used when installing copper cooling head bushing, at least 2 hours each, when fully cooled after, with its rings lift copper bushing, from under the rings to use flat gaskets to ensure dynamic cone copper sleeve edges and bottom edge parallel.
 
3. Countershaft bushing
Outer copper bushing sheath pulled by homemade devices removed within the copper sleeve can be removed using a center rod means hammering out the copper sleeve split out, you need to check the size of the hole in the creel is reasonable. When installing the countershaft bushing, use dry ice shrink at least 2 hours
  
Installing cone crusher spare parts
When installing the countershaft bushing, use dry ice shrink at least two hours. After installation is completed, you need to install the top screws, screw fastening needs painted with a professional plastic.
Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]